| 1.) Comphrehensive
Inspection: Special features are recorded.
|
2.) Main sub-assemblies are dismantled. |
3.) Sub-assemblies stripped to each small part. |
4.) Each part is throughly evaluated. |
| 5.) Un-usable or worn
parts are discarded. |
6.) Replacement parts are obtained from stock. |
7.) Breaker is completely re-assembled:from individual parts to sub-assembly, to final assembly. |
8.) Critical gaps and tolerances are set & dashpots resealed. |
| 9.) Rewire (New) to customer's specifications.
|
10.) Overload Coordination: Primary injection/curve matching.
|
11.) Electrical Test:
Electrical Operation/
High Potential.
|
12.) Crating: All items are carefully packed and crated.
|